This article contains links to supplementary instructions for how to assemble the Skills field for the ADC Pro Mission 2026-2027 Off Grid competition. First review the ADC Pro Mission 2026-2027 Off Grid Competition Section 8 (Skills Field) for the primary assembly and layout instructions. Information in the Competition Manual and Official ADC Pro Q&A take precedence in the cases where information in this article may differ.
ADC Pro Competition field equipment can be purchased directly from Drone Competition Gates.
Skills Field Equipment
A complete Skills Field consists of the following:
| Qty | SKU | Name |
| 1 | ADCP-SG001 | ADC Pro Mission 2026-2027 Skills Game Element Kit |
If you will be hosting an event and need additional Skills Fields, consider borrowing equipment from an attending team.
IMPORTANT: First review Section 8 of the ADC Pro Mission 2026-2027 Off Grid Competition Manual. The additional instructions below will help you with assembling the individual elements.
Unboxing the Skills Field Element Kit
A Skills Field Element Kit (ADCP-SG001) includes:
- (4) Coding Mats
- (1) Arch Gates
- (1) Arch
- (2) Bases
- (2) Fly Through Panels
- (2) Multi-color Pads
- (1) Keyhole Assembly
- (1) Blue Keyhole
- (1) Teal Keyhole
- (1) Base and Pole
- (1) T-connector
- (1) Canister
- (1) April Tag Sticker Sheet
- (12) Barriers
- Clear Tape (for Barriers)
Keyhole Gate Assembly
Tips:
- The legs of the base may slightly extend outside of the Coding Mat perimeter.
- If you notice the Teal Keyhole gate sagging similar to the picture below, rotate the keyhole 180 degrees and it should fix this so that it is angled parallel to the floor. A slight angle is permissible.
Barrier Assembly
The Barriers come in the kit as flat cardboard pieces that need to be folded and secured with clear tape.
- Fold over the Barriers at the two crease lines with strong pressure. This will help to keep the final shape when taping the edges.
- Fold the Barrier into a triangular shape. Ensure that the shorter folded edge is folded first, and the longer side is on the bottom of the Barrier.
Correct Fold Example
Incorrect Fold Example
- Use the clear tape to secure both ends of the Barrier.
- Use the clear tape to secure the long end of the Barrier. This is to prevent bowing of the long edge so that the Barrier sits flat on the floor.
Finished Barrier